+966 54 310 0261 r.altaameer@gmail.com Madinah – Saudi Arabia
العربية

Quality & safety

No pour without inspection, no work without safety.

Q

Quality control

  • Review of drawings and specifications before execution
  • Rebar and formwork approved by the consultant before pouring
  • Concrete samples and tests per project requirements
  • Every stage documented with photos and records
  • Snags closed before moving to the next stage
S

Occupational safety

  • Safety officer on site
  • PPE mandatory for all workers
  • Excavations, scaffolding and openings secured
  • Shoring for deep excavations
  • Regular inspections and corrective-action log
E

Site and environment

  • Organised site with clear equipment routes
  • Waste managed and removed continuously
  • Workers briefed on site procedures before starting
  • Emergency plan and first aid on site
  • No confined-space entry without a permit
Safety discipline

A four-step system

We keep a record of every violation and action taken on site.

01

First violation

Verbal warning, noted in the worker's file

02

Second violation

Written warning

03

Third violation

Written warning and suspension

04

Fourth violation

Written report and removal from site

Have a residential project in Madinah?

Send us the drawings and BOQ, and we'll reply with a quote and a schedule.